search
Search:
Skip to:
Content
|
Footer
|
Accessibility
Stay connected:
Share
Home
Project Overview
News & Facts
Library
Routes
Construction
Gallery
Calendar
Board
Contact
Español
Introduction
Glossary
Project Sections
Altamont Corridor
Bakersfield - Palmdale
Fresno - Bakersfield
Los Angeles - Anaheim
Los Angeles - San Diego
Merced - Bakersfield (old)
Merced - Fresno
Palmdale - Los Angeles
Sacramento - Merced
San Francisco - San Jose
San Jose - Merced
Library Topics
Ag Working Group
Archived Materials
Board Meeting Materials
Business & Job Opportunities
Business Plans
Construction Update
Heavy Maintenance Facilities
Industry Forums
Investor Relations
Legislation
Maps
Partnerships
Request for Expressions of Interest
Right of Way Information
Small Business Resources
Station Area Planning
Sustainability
Title VI Program
Transparency
Funding
Federal Stimulus
Funding Information
High Speed Intercity Passenger Rail Program
Studies and Reports
Bay Area to Central Valley Partially Revised Final Program EIR
Final Environmental Impact Report/Statement: Merced to Fresno
Draft Environmental Impact Report/Statement: Merced to Fresno
Revised Draft Enviromental Impact Report/Statement: Fresno to Bakersfield
Draft Environmental Impact Report/Statement: Fresno to Bakersfield
Project-Level Environmental & Engineering Guidelines
Regional Economic Studies
Ridership and Revenue Forecasting Study
Statewide Program Environmental Reports EIR/EIS
Urban Design Guidelines
Engineering and Environmental Technical Memos
TM 0.0a Design Terms and Acronyms
09/05/2008
Release date: 9/05/08
Current revision: R1
TM 0.1 15 % Design Scope
06/03/2008
Release date: 6/03/08
Current revision: R1
TM 0.1.1 30 % Design Scope
07/08/2011
Release date: 7/08/11
Current revision: R01
TM 0.3 CHSTP Basis of Design Report
09/01/2010
Release date: 9/01/10
Current revision: R02
TM 0.5 Coordination with Caltrans
12/30/2009
Release date: 12/30/09
Current revision: R01
TM 0.6 Risk Register Development Protocol
03/11/2010
Release date: 3/11/10
Current revision: R01
TM 0.7 Design Submittal Protocol
08/30/2010
Release date: 8/30/10
Current revision: R02
TM 1.1.1 Codes, Regulations, Design Standards, and Guidelines
07/10/2009
Release date: 7/10/09
Current revision: R00
TM 1.1.10 High Speed Equiment Structure Gauges
03/24/2010
Release date: 3/24/10
Current revision: R00
TM 1.1.18 Design Variance Guidelines
07/27/2011
Release date: 7/27/11
Current revision: R01
TM 1.1.19 15% Capital Cost Method
01/11/2011
Release date: 1/11/11
Current revision: R01
TM 1.1.2 Design Life
06/08/2009
Release date: 6/08/09
Current revision: R00
TM 1.1.21 Typical Cross Sections for 15% Design
04/08/2009
Release date: 4/08/09
Current revision: R00
TM 1.1.22 30% Cost Estimating Methodology
06/06/2012
Release date: 3/11/2011
Current revision: R00
TM 1.1.4 Engineering Mapping and Surveys
03/16/2010
Release date: 3/16/10
Current revision: R01
TM 1.1.5 CADD Guidelines
10/05/2009
Release date: 10/05/09
Current revision: R02
TM 1.1.6 Alignment Stds for Shared Use Corridor – LA to Anaheim
Release date: 1/03/08
Current revision: R00
TM 1.1.8 Proposed Methodology for Demarcation of Territorial Subdivisions and Milepost Numerics
03/24/2010
Release date: 3/24/10
Current revision: R00
TM 100 01 Peer Review
01/01/2011
Release date: 1/11/11
Current revision: R0
TM 100.03 FRA Drawing Review
04/12/2012
Release date:11/16/2011
Current revision: R00
TM 2.1.2 Alignment Design Standards for High-Speed Train Operation
04/08/2009
Release date: 4/08/09
Current revision: R00
TM 2.1.3 Turnouts and Station Tracks
06/29/2009
Release date: 6/29/09
Current revision: R00
TM 2.1.7 Intrusion Protection
10/25/2008
Release date: 10/25/08
Current revision: R00
TM 2.1.8 Turnouts and Yard Tracks
07/17/2009
Release date: 7/17/09
Current revision: R00
TM 2.10.10 Track Structure Interaction
07/09/2010
Release date: 7/09/10
Current revision: R00
TM 2.10.4 Interim Seismic Design Criteria
07/08/2011
Release date: 7/8/11
Current revision: R01
TM 2.10.5 15% Seismic Design Benchmark
03/29/2010
Release date: 3/29/10
Current revision: R00
TM 2.10.6 Fault Rulpture Analysis and Mitigation
06/11/2010
Release date: 6/11/10
Current revision: R00
TM 2.2.2 Station Program Design Guidelines (Policy)
06/07/2011
Release date: 6/07/11
Current revision: R01
TM 2.2.3 High-Speed Train Passenger Station Site Design Guidelines
04/11/2009
Release date: 4/10/09
Current revision: R00
TM 2.2.4 Station Platform Geometric Design
07/07/2010
Release date: 7/07/10
Current revision: R01
TM 2.3.2 Structure Design Loads
07/08/2011
Release date: 7/08/11
Current revision: R
TM 2.3.3 Design Guidelines for High-Speed Train Aerial Structures
06/02/2009
Release date: 6/02/09
Current revision: R00
TM 2.4.2 Basic Tunnel Configuration
11/15/2010
Release date: 11/15/10
Current revision: R01
TM 2.4.5 Tunnel Structure Design
08/03/2010
Release date: 8/03/10
Current revision: R00
TM 2.4.6 Tunnel Portal Facilities
06/21/2010
Release date: 6/21/10
Current revision: R00
TM 2.4.8 Service Maintenance Considerations for HST Tunnels
06/25/2010
Release date: 6/25/10
Current revision: R00
TM 2.5.1 Structure Design of Surface Facilities and Buildings
06/10/2010
Release date: 6/10/10
Current revision: R00
TM 2.6.5 Hydraulics and Hydrology Design Guidelines
07/27/2011
Release date: 7/27/11
Current revision: R01
TM 2.6.7 Earthwork and Track Bed Design Guidelines
07/23/2009
Release date: 7/23/09
Current revision: R00
TM 2.7.4 Utilities Requirements for 15% Design
11/20/2008
Release date: 11/20/08
Current revision: R00
TM 2.7.5 Utility Requirements for 30% Design.
07/26/2012
Release date: 6/26/12
Current revsion: R00
TM 2.8.2 Access Control for HSR ROW and Facilities
10/11/2010
Release date: 10/11/10
Current revision: R00
TM 2.9.1 Geotechnical Investigation Guidelines
07/27/2011
Release date: 7/27/11
Current revision: R01
TM 2.9.10 Geotechnical Design Guidelines
07/18/2011
Release date: 7/18/11
Current revision: R01
TM 2.9.2 Geotech Reports Preparation Guidelines
07/27/2011
Release date: 7/27/11
Current revision: R01
TM 2.9.3 Geologic and Seismic Hazard Analysis Guidelines
07/27/2011
Release date: 7/27/11
Current revision: R01
TM 2.9.6 Interim Ground Motion
03/11/2010
Release date: 3/11/10
Current revision: R00
TM 200 01 Seismic Design and Ground Motion
07/10/2010
Release date: 7/10/10
Current revision: R0
TM 200 02 Utility Strategy
04/14/2011
Release date: 4/13/11
Current revision: R0
TM 200.06 Aesthetic Guidelines
04/12/2012
Release date: 4/03/2011
Current revision: R00
TM 3.1.1.1 2x25 kV Autotransformer System
04/06/2010
Release date: 4/06/10
Current revision: R02
TM 3.1.1.3 Traction Power Facilities General Standardization Requirements
06/10/2010
Release date: 6/10/10
Current revision: R02
TM 3.1.5.3 Utility Power Supply for TPS
06/15/2010
Release date: 6/15/10
Current revision: R01
TM 3.2.1 OCS Requirements
08/06/2010
Release date: 8/16/10
Current revision: R01
TM 3.2.2 OCS Structural Requirements
06/08/2010
Release date: 6/08/10
Current revision: R00
TM 3.2.3 Pantograph Clearances
07/17/2009
Release date: 7/17/09
Current revision: R00
TM 3.2.6 TES Requirements for Grounding and Bondings and Protection Against Electric Shock
06/11/2010
Release date: 6/11/10
Current revision: R00
TM 3.3.1 ATC Concept of System
06/28/2010
Release date: 6/28/10
Current revision: R00
TM 3.3.2 ATC Site Requirements
06/28/2010
Release date: 6/28/10
Current revision: R00
TM 3.3.3 ATC Wayside Power Supply Options
06/28/2010
Release date: 6/28/10
Current revision: R00
TM 3.3.4 Grounding and Bonding Requirements for Train Control and Communications
06/06/2010
Release date: 6/10/10
Current revision: R00
TM 3.4.1 Communications System General Reqts
09/27/2010
Release date: 9/27/10
Current revision: R00
TM 3.4.11 EMI Footprint Procedure
03/23/2010
Release date: 3/23/10
Current revision: R00
TM 3.4.2 Communications Systems Site Requirements
07/07/2010
Release date: 7/07/10
Current revision: R00
TM 300 01 TPS Interconnections to Utility
05/12/2011
Release date: 04/12/11
Current revision: R0
TM 300 02 EMC Program Plan
07/26/2012
Current Release date: 6/26/12
Current revision: R00
TM 300 03 RF Spectrum Acquisition Strategy
05/04/2011
Release date: 05/04/11
Current revision: R0
TM 300 04 ATC-Radio-Spectrum-Whitepaper
05/04/2011
Release date: 04/05/11
Current revision: R0
TM 300 06 RF Propagation Simulations
07/26/2012
Current Release date: 6/26/12
Current Revision: R00
TM 300 07 CHSTP EIR-EIS Assessment of CHSTP Alignment EMF Footprint
07/26/2012
Release date: 6/26/12
Current revision: R00
TM 4.1 LOSSAN Concept Level Operation Feasibility Study
06/28/2008
Release date: 6/12/08
Current revision: R02
TM 4.1.1 Justification for Two Track Station Configuration – LA to Anaheim
07/10/2009
Release date: 7/10/09
Current revision: R00
TM 4.2 Phase 1 Service Plan
11/26/2008
Release date: 11/26/08
Current revision: R00
TM 5.1 Terminal and Heavy Maintenance Facility Guidelines
08/05/2009
Release date: 8/05/09
Current revision: R00
TM 5.3 Summary Description of Requirements and Guidelines
08/05/2009
Release date: 8/05/09
Current revision: R00
TM 6.1 Selected Train Technologies
05/30/2008
Release date: 5/30/08
Current revision: R00
TM 6.3 Trainset Configuration Analysis and Recommendation
09/23/2009
Release date: 9/23/09
Current revision: R00
TM 600 01 Vehicle Width
12/13/2010
Release date: 13/12/10
Current revision: R0
TM 600 02 CHSTP Test Track
05/20/2011
Release date: 04/20/11
Current revision: R0
TM 600 03 Interoperability
05/26/2011
Release date: 05/26/11
Current revision: R0
TM 7.3 International Rail Standards
05/11/2009
Release date: 5/11/09
Current revision: R00